Select Page
Kit Log #019: Motor kit 0.5->3

Kit Log #019: Motor kit 0.5->3

This is almost a similar step to the previous kit log, but with the motor kit instead. The packing list was created and completed for this kit. Triple checked the count of fasteners, it seems to make sense, so the test will be with the beta testers to see if it is for sure correct.

In the previous kit log we mentioned the next step would be making the packing list for the super bright lights kit – but that was also already done. Some confusion. Currently super bright lights, operator interface, and motor kit are at step 3. This means these kits are waiting to have the assembly photos organized and edited. The next step will be to start tackling this. The power pack instructions also need the written descriptions to be completed.